Concept design by Pagekade. Ridgeline Custom Homes is made up.
RIDGELINECustom Homes Request a site visit
A limestone and dark cedar home with a standing-seam steel roof on a Hill Country slope at dusk, windows glowing, live oaks around it. Example project. AI-generated image.

Built for the lot you fell for.

We design and build 8 to 12 custom homes a year on our clients' own land west of Austin. Limestone, steel roofs, deep porches, and a fixed price before we break ground.

Watch a Ridgeline home go up

Every home follows the same five stages. Scroll and the drawing builds with you. Every Friday of the build you get a photo report and next week's plan, so nothing here is a surprise.

Elevation drawing of a Ridgeline homeA two-part Hill Country house: a tall limestone gable on the left and a long low wing with a standing-seam steel roof on the right, with a live oak beside it. The drawing adds one stage at a time: survey stakes, foundation, timber frame, roof, then stone, glass and landscape. Footprint 92 ft
Ridgeline Custom HomesSouth elevation, all stagesNot to scale

  1. Months 1 to 6

    Walk the lot, then draw the house

    We walk your land with you before anything is drawn: where the sun sets, which oaks to keep, where the limestone sits under the soil. Our architect partner designs the house around that, and we stake the corners so you can stand in your future kitchen.

    You decideThe floor plan, the budget band and the finish level. You get a fixed price before we break ground.

  2. 1 to 2 months

    Foundation

    Most Hill Country lots hit limestone a foot or two down. We cut the pad into the rock, set the piers and pour a post-tensioned slab. An engineer inspects the steel before every pour.

    You seeThe slab and the engineer's report in your Friday update.

  3. 2 to 3 months

    Frame

    Kiln-dried lumber, framed by our own crew. Before insulation goes in, you walk the frame with your project lead and mark every outlet, switch and shelf. A change now costs a little. Later it costs a lot.

    You walkThe pre-drywall walkthrough, about two hours on site.

  4. 1 to 2 months

    Roof and dry-in

    The standing-seam steel roof, house wrap and windows go on, so the house is closed against rain. Plumbing, wiring and air systems follow, each one inspected by the city or county.

    You chooseFinal light fittings and plumbing fixtures, from a shortlist we prepare.

  5. 4 to 6 months

    Stone, finishes and keys

    Texas limestone laid by masons we have worked with for years, then cabinets, floors, tile and paint. A final walkthrough with a punch list, then keys, a binder with every warranty, and a visit from us at 11 months to fix whatever has settled.

    You getKeys, the warranty binder and our cell numbers.

How long the whole build takes

  1. Site and design3 to 6 months
  2. Foundation1 to 2
  3. Frame2 to 3
  4. Roof, dry-in1 to 2
  5. Finishes and keys4 to 6

Typical ranges, example About 11 to 19 months from the first walk on your lot to the keys. Widths show the longest usual time for each stage. Rock, rain and permit queues are the usual reasons a stage runs long, and you hear about it the same week.

Three recent homes

Example projects Each one started with a walk on a bare lot. Sizes and build times are what we would show for real projects.

A long, low limestone home with a deep shaded porch and a steel roof above Lake Travis in late afternoon light.
The Bluff House, Lake Travis4,200 sq ft16 monthsAI-generated image.
A deep cedar porch at dusk with rocking chairs, ceiling fans and a view over rolling hills.
Creek Porch House, Wimberley3,100 sq ft13 monthsAI-generated image.
A kitchen with white oak cabinets, a limestone wall, a long island and tall steel windows looking out to oaks.
Oak Hollow, Dripping Springs3,600 sq ft14 monthsAI-generated image.
Close-up of a mason's gloved hands setting a cut block of pale Texas limestone into a fresh mortar bed.
Detail. AI-generated image.

The stone is from forty miles away

Our limestone comes from quarries in the Hill Country, cut to size and laid by hand by the same two mason crews on every home. The steel for our roofs is rolled on site so each panel runs from ridge to eave without a seam across it.

We build a small number of homes a year on purpose. Your project lead runs no more than three builds at once.

What a custom home costs out here

Most of our homes cost between $425 and $650 per square foot to build, before land. Move the slider for a first range, then we give you a real number after the site visit.

3,500 sq ft
Finish level

Build cost, example range

$1.49M to $1.75M

Per square foot of conditioned space. Not included: land, rock work, septic, well, driveway and property tax. This is an example estimate, not a quote.

What changes the price on Hill Country land

  • RockLimestone near the surface means cutting, not digging. We price it after we probe the pad.
  • Septic and waterOutside city lines most lots need a septic system and some need a well. Both are designed for your soil.
  • Slope and accessA steep lot needs more foundation and a longer driveway. Views cost a little extra to reach.
  • Your finish choicesAllowances for tile, lighting and fixtures are written into the contract, line by line.

Texas doesn't license home builders. Ask for these instead.

There is no state licence for residential builders in Texas, so anyone can call themselves one. Ask every builder you talk to for these six things, in writing.

Ask forAt Ridgeline
A certificate of general liability insuranceSent with every proposal
Builder's risk insurance during the buildIncluded in our price
A 10-year structural warranty from a third-party companyOn every home, plus our own 2-year workmanship warranty
State-licensed plumbers and electricians on the jobLicence numbers listed in your contract
A fixed price with a written allowance scheduleSigned before we break ground
Lien releases from every supplier with each paymentWith every draw, in your project folder

Walk your lot with us

A site visit takes about an hour and costs nothing within 60 miles of our studio. Bring the survey if you have one. We bring a probe bar, a level and honest answers.

We build in Dripping Springs, Driftwood, Wimberley, Bee Cave, Lakeway, Spicewood, West Lake Hills and the land in between.

(512) 555-0186Monday to Friday, 7:30 am to 5:30 pmOur project lead calls you back within one working day.
What would you like?

Budget for the build, before land

When would you like to start building?

So the project lead can call to set a time.

We use your details only to arrange this visit.